Author Publications

Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Date | Item Type
Jump to: 2014 | 2013 | 2012 | 2011 | 2009 | 2006 | 2003 | 2002
Number of items: 23.

2014

Chivata Cardenas, Ibsen and Al-Jibouri, Saad S.H. and Halman, Johannes I.M. and Tol, Frits A. van (2014) Modeling Risk-Related Knowledge in Tunneling Projects. Risk analysis, 34 . 323 - 339. ISSN 0272-4332

2013

Chivatá Cárdenas, I.C. and Al-jibouri, S.H.S. and Halman, J.I.M. (2013) Relevant risk factors associated with the construction of excavated tunnel cross-passages in soft soils. Geotechniek, 17 (1). 30 - 35. ISSN 1386-2758

Chivatá Cárdenas, I.C. and Al-jibouri, S.H.S. and Halman, J.I.M. and Tol, F. van (2013) Capturing and integrating knowledge for managing risks in tunnel works. Risk analysis, 33 (1). 92 - 108. ISSN 0272-4332

Yu, H. and Al-Hussein, M. and Al-jibouri, S.H.S. and Telyas, A. (2013) Lean transformation in a modular building company: a case for implementation. Journal of management in engineering, 29 (1). 103 - 111. ISSN 0742-597X

2012

Alwisy, A. and Al-Hussein, M. and Al-jibouri, S.H.S. (2012) BIM approach for automated drafting and design for modular construction manufacturing. In: Computing in civil engineering, 17-20 June 2012, Reston, Virginia , USA (pp. 221 - 228).

Cardenas, I.C. and Al-jibouri, S.H.S. and Halman, J.I.M. (2012) A Bayesian Network Based Risk Model for Volume Loss in Soft Soils in Mechanized Bored Tunnels. In: Proceedings of World Tunnel Congress 2012 and 38th General Assembly of International Tunneling and Underground Space Association, 18-23 May 2012.

Chivatá Cárdenas, I.C. and Al-jibouri, S.H.S. and Halman, J.I.M. (2012) A bayesian belief networks approach to risk control in construction projects. In: 14th international conference on computing in civil and building engineering, 27-29 June 2012, Moscow, Russia (pp. 340 - 351).

Chivatá Cárdenas, I.C. and Al-jibouri, S.H.S. and Halman, J.I.M. (2012) A bayesian nework based risk model for volume loss in soft soils in mechanized bored tunnels. In: World tunneling congress 2012, Bangkok, Thailand.

Chivatá Cárdenas, I.C. and Al-jibouri, S.H.S. and Halman, J.I.M. (2012) Uncertainty modeling in risk analysis using bayesian networks. In: World congress on risk, Sydney, Australia.

Han, S.H. and Al-Hussein, M. and Al-jibouri, S.H.S. and Yu, H. (2012) Automated post-simulation visualization of modular building production assembly line. Automation in construction, 21 . 229 - 236. ISSN 0926-5805

Haponava, T. and Al-jibouri, S.H.S. (2012) Proposed system for measuring project performance using process-based key performance indicators. Journal of management in engineering, 28 . 140 - 149. ISSN 0742-597X

Moghadam, M. and Al-Hussein, M. and Al-jibouri, S.H.S. and Telyas, A. (2012) Post simulation visualization model for effective scheduling of modular building construction, special issue on construction engineering and management. Canadian journal of civil engineering, 39 (9). 1053 - 1061. ISSN 0315-1468

Ronhaar, A. and Halman, J.I.M. and Al-jibouri, S.H.S. (2012) Geotechnisch falen, een verkenning naar de perceptie van professionals over geotechnisch falen. Geotechniek, 01 . 38 - 41. ISSN 1386-2758

2011

Mawdesley, M. and Long, G. and Al-Jibouri, S. and Scott, D. (2011) The enhancement of simulation based learning exercises through formalised reflection, focus groups and group presentation. Computers & Education, 56 (1). pp. 44-52. ISSN 0360-1315

2009

Cardenas, I.C. and Halman, J.I.M. and Al-Jibouri, S.H. (2009) An uncertainty-based framework to support decision-making in geotechnical engineering projects. In: fourth scottish conference for postgraduate researchers of the built & natural environment (PRoBE)., November 2009, Glasgow (pp. pp. 45-56).

2006

Haponava, T. and Al-Jibouri, S. and Reymen, I. (2006) Process performance indicators in project pre-design stage. In: CIB W96 Adaptables Conference, July 3-5 2006, Eindhoven, The Netherlands.

2003

Mawdesley, Michael J. and Al-Jibouri, Saad H. (2003) Proposed genetic algorithms for construction site layout. Engineering Applications of Artificial Intelligence, 16 (5-6). pp. 501-509. ISSN 0952-1976

2002

Al-Jibouri, Saad H. (2002) Effects of resource management regimes on project schedule. International Journal of Project Management, 20 (4). pp. 271-277. ISSN 0263-7863

Al-Jibouri, Saad H. (2002) Monitoring systems and their effectiveness for project cost control in construction. International Journal of Project Management, 21 (2). pp. 145-154. ISSN 0263-7863

Al-Jibouri, Saad H. and Mawdesley, Michael J. (2002) A knowledge based system for linking information to support decision making in construction. Electronic Journal of IT in Construction, 7 (Special). pp. 83-100. ISSN 1874-4753

Askew, W.H. and Al-Jibouri, S.H. and Mawdesley, M.J. and Patterson, D.E. (2002) Planning linear construction projects: automated method for the generation of earthwork activities. Automation in Construction, 11 (6). pp. 643-653. ISSN 0926-5805

Mawdesley, M.J. and Al-Jibouri, S.H.S. and Askew, W.H. and Patterson, D.E. (2002) A model for the automated generation of earthwork planning activities. Construction Innovation, 2 (2). pp. 249-268. ISSN 1471-4175

Mawdesley, Michael J. and Al-Jibouri, Saad H. and Yang, Hongbo (2002) Genetic Algorithms for Construction Site Layout in Project Planning. Journal of construction engineering and management, 128 (5). pp. 418-426. ISSN 0733-9364

This list was generated on Mon Apr 21 05:15:23 2014 CEST.