Author Publications
2013
Alvarez, E.M. and Heijden van der, M.C. and Zijm, W.H.M. (2013) Service differentiation in spare parts supply through dedicated stocks. Annals of operations research . ISSN 0254-5330
Haneyah, S.W.A. and Schutten, J.M.J. and Schuur, P.C. and Zijm, W.H.M. (2013) Generic planning and control of automated material handling systems : practical requirements versus existing theory. Computers in industry, 64 (3). 177 - 190. ISSN 0166-3615
2012
Alvarez, E.M. and Heijden van der, M.C. and Vliegen, I.M.H. and Zijm, W.H.M. (2012) Service differentiation through selective lateral transshipments. [Report]
Alvarez, E.M. and Heijden van der, M.C. and Zijm, W.H.M. (2012) The selective use of emergency shipments for service-contract differentiation. International journal of production economics, 2012 . ISSN 0925-5273
Alvarez, E.M. and Heijden van der, M.C. and Zijm, W.H.M. (2012) Service differentiation in spare parts supply through dedicated stocks. [Report]
Avsar, Z.M. and Zijm, W.H.M. (2012) Erratum to "Capacitated two-indenture models for repairable item systems" [International Journal of Production Economics 81-82 (2003) 573-588]. International journal of production economics, 135 (2). 997 - 997. ISSN 0925-5273
2011
Haneyah, Sameh and Hurink, Johann and Schutten, Marco and Zijm, Henk and Schuur, Peter (2011) Planning and control of automated material handling systems: The merge module. In: Annual International Conference of the German Operations Research Society 2011, 1-3 Sep 2010, Munich, Germany.
Haneyah, Sameh and Zijm, Henk and Schutten, Marco and Schuur, Peter (2011) Generic Planning and Control of Automated Material Handling Systems: Practical Requirements Versus Existing Theory. [Report]
2010
Kok, A.L. and Hans, E.W. and Schutten, J.M.J. and Zijm, W.H.M. (2010) Vehicle Routing with Traffic Congestion and Drivers' Driving and Working Rules. [Report]
Kok, A.L. and Hans, E.W. and Schutten, J.M.J. and Zijm, W.H.M. (2010) A dynamic programming heuristic for vehicle routing with time-dependent travel times and required breaks. Flexible Services and Manufacturing Journal, 22 (1-2). pp. 83-108. ISSN 1936-6582
2008
Zijm, Henk and Timmer, Judith (2008) Coordination mechanisms for inventory control in three-echelon serial and distribution systems. Annals of Operations Research, 158 (1). pp. 161-182. ISSN 0254-5330
Zijm, W.H.M. (2008) Redevoering dies natalis : 47ste dies natalis, 28 november 2008 : Footprints of science: wetenschap, technologie en samenleving: keuzes en dilemma's. thesis.
2007
Zijm, W.H.M. and Kuipers, J.A.M. (2007) Redevoeringen dies natalis : 46ste dies natalis, 30 november 2007. [Lecture]
2006
Spanjers, L. and Ommeren van, J.C.W. and Zijm, W.H.M. (2006) Closed loop two-echelon repairable item systems. In: Stochastic Modeling of Manufacturing Systems. Springer, Berlin, pp. 223-252. ISBN 9783540265795
2005
Flierman, A.H. and Zijm, W.H.M. (2005) Omringd door zee : redevoeringen. [Lecture]
Spanjers, L. and Ommeren van, J.C.W. and Zijm, W.H.M. (2005) Closed loop two-echelon repairable item systems. OR Spectrum, 27 (2-3). pp. 369-398. ISSN 0171-6468
2004
Meng, G. and Heragu, S.S. and Zijm, H. (2004) Reconfigurable layout problem. International Journal of Production Research, 42 (22). pp. 4709-4729. ISSN 0020-7543
Zijm, W.H.M. and Timmer, J.B. (2004) Coordination mechanisms for inventory control in three-echelon serial and distribution systems. [Report]
2003
Spanjers, L. and Ommeren van, J.C.W. and Zijm, W.H.M. (2003) Closed-loop two-echelon repairable item systems. [Report]
Zijm, W. Henk and Avsar, Zeynep Müge (2003) Capacitated two-indenture models for repairable item systems. International Journal of Production Economics, 81-82 . pp. 573-588. ISSN 0925-5273
Zijm, W. Henk and Avsar, Zeynep Müge (2003) Capacitated two-indenture models for repairable item systems. International Journal of Production Economics, 81-82 . pp. 573-588. ISSN 0925-5273
2001
Assen van, M.F. and Velde van de, S.L. and Zijm, W.H.M. (2001) De onoverkomelijkheden van het MRP-paradigma. Bedrijfskunde, 73 (4). pp. 55-64. ISSN 0165-0971
Giebels, M.M.T. and Kals, H.J.J. and Zijm, W.H.M. (2001) Building holarchies for concurrent manufacturing planning and control in EtoPlan. Computers in Industry, 46 (3). pp. 301-314. ISSN 0166-3615
Heragu, Sunderesh and Meng, Gang and Zijm, Henk and Ommeren van, Jan-Kees (2001) Analysis of cellular manufacturing systems. [Report]
Heragu, Sunderesh and Meng, Gang and Zijm, Henk and Ommeren van, Jan-Kees (2001) Design and analysis of reconfigurable layout systems. [Report]
Heragu, Sunderesh and Zijm, Henk (2001) Design and performance evaluation of Agile manufacturing systems. [Report]
Houtum van, G.J. and Adan, I.J.B.F. and Wessels, J. and Zijm, W.H.M. (2001) Performance analysis of parallel identical machines with a generalized shortest queue arrival mechanism. OR Spectrum, 23 (3). pp. 411-427. ISSN 0171-6468
Litvak, N. and Adan, I.J.B.F. and Wessels, J. and Zijm, W.H.M. (2001) Order picking in carousel systems under the nearest item heuristic. Probability in the Engineering and Informational Sciences, 15 (2). pp. 135-164. ISSN 0269-9648
Rustenburg, W.D. and Houtum van, G.J. and Zijm, W.H.M. (2001) Systeemgericht spare parts management bij de Nederlandse Koninklijke Marine. Bedrijfskunde, 73 (2). pp. 28-39. ISSN 0165-0971
Zijm, W.H.M. and Avsar, Z.M. (2001) Capacitated two-indenture models for repairable item systems. [Report]
2000
Avsar, Z.M. and Zijm, W.H.M. (2000) Resource-constrained two-echelon inventory models for repairable item systems. [Report]
Houtum van, G.J. and Zijm, W.H.M. (2000) On the relationship between cost and service models for general inventory systems. Statistica Neerlandica, 54 (2). pp. 127-147. ISSN 0039-0402
Houtum van, G.J. and Zijm, W.H.M. (2000) On the relation between cost and service models for general inventory systems. [Report]
Litvak, N. and Adan, I.J.B.F. and Wessels, J. and Zijm, W.H.M. (2000) Order picking in carousel systems under the nearest item heuristic. [Report]
Rouwenhorst, B. and Reuter, B. and Stockrahm, V. and Houtum van, G.J. and Mantel, R.J. and Zijm, W.H.M. (2000) Warehouse design and control: Framework and literature review. European Journal of Operational Research, 122 (3). pp. 515-533. ISSN 0377-2217
1999
Berg van den, J.P. and Zijm, W.H.M. (1999) Models for warehouse management: classification and examples. International Journal of Production Economics, 59 (1-3). pp. 519-528. ISSN 0925-5273
1997
Boer de, R. and Schutten, J.M.J. and Zijm, W.H.M. (1997) A Decision Support System for Ship Maintenance Capacity Planning. CIRP Annals, 46 (1). pp. 391-396. ISSN 0007-8506
1996
Houtum van, G.J. and Inderfurth, K. and Zijm, W.H.M. (1996) Materials coordination in stochastic multi-echelon systems. European Journal of Operational Research, 95 (1). pp. 1-23. ISSN 0377-2217
Schutten, J.M.J. and Velde van de, S.L. and Zijm, W.H.M. (1996) Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times. Management Science, 42 (8). pp. 1165-1174. ISSN 0025-1909
Zijm, W.H.M. (1996) Reengineering Production Systems: the Royal Netherlands Naval Dockyard. CIRP Annals, 45 (1). pp. 427-432. ISSN 0007-8506
Zijm, W.H.M. and Buitenhek, R. (1996) Capacity Planning and Leadtime management. International Journal of Production Economics, 46-47 . pp. 165-179. ISSN 0925-5273
1995
Zijm, W.H.M. and Kals, H.J.J. (1995) The Integration of Process Planning and Shop Floor Scheduling in Small Batch Part Manufacturing. CIRP Annals, 44 (1). pp. 429-432. ISSN 0007-8506
1994
Zijm, Henk and Houtum van, Geert-Jan (1994) On multi-stage production/inventory systems under stochastic demand. International Journal of Production Economics, 35 (1-3). pp. 391-400. ISSN 0925-5273
1993
Adan, I.J.B.F. and Wessels, J. and Zijm, W.H.M. (1993) Matrix-geometric analysis of the shortest queue problem with threshold jockeying. Operations Research Letters, 13 (2). pp. 107-112. ISSN 0167-6377
Zijm, W.H.M. and Harten van, A. (1993) Process planning for a modular component placement system. International Journal of Production Economics, 30-31 . pp. 123-135. ISSN 0925-5273
Zijm, W.H.M. and Slomp, J. (1993) A manufacturing planning and control system for a flexible manufacturing system. Robotics and Computer-Integrated Manufacturing, 10 (1-2). pp. 109-114. ISSN 0736-5845
1992
Zijm, W.H.M. (1992) Hierarchical Production Planning and multi-echelon inventory management. International Journal of Production Economics, 26 (1-3). pp. 257-264. ISSN 0925-5273
1991
Houtum van, G.J.J.A. and Zijm, W.H.M. (1991) Computational procedures for stochastic multi-echelon production systems. International Journal of Production Economics, 23 (1-3). pp. 223-237. ISSN 0925-5273