Reengineering Production Systems: the Royal Netherlands Naval Dockyard
Zijm, W.H.M. (1996) Reengineering Production Systems: the Royal Netherlands Naval Dockyard. CIRP Annals, 45 (1). pp. 427-432. ISSN 0007-8506
| PDF 707Kb |
| Abstract: | Reengineering production systems in an attempt to meet tight cost, quality and leadtime standards has received considerable attention in the last decade. In this paper, we discuss the reengineering process at the Royal Netherlands Naval Dockyard. The process starts with a characterisation and a careful analysis of the production system and the set of objectives to be pursued. Next, a new production management structure is defined after which supporting planning and control systems are designed and a number of organisational changes are carried through. In this way, the Dockyard may combine high technological capabilities with an excellent logistic performance. |
| Item Type: | Article |
| Copyright: | © 1996 Elsevier |
| Faculty: | Management and Governance (SMG) |
| Research Chair: | |
| Research Group: | |
| Link to this item: | http://purl.utwente.nl/publications/73195 |
| Official URL: | http://dx.doi.org/10.1016/S0007-8506(07)63095-9 |
| Export this item as: | BibTeX EndNote HTML Citation Reference Manager |
Repository Staff Only: item control page
Metis ID: 144433

Show download statistics for this publication
Show download statistics for this publication