Reengineering Production Systems: the Royal Netherlands Naval Dockyard

Share/Save/Bookmark

Zijm, W.H.M. (1996) Reengineering Production Systems: the Royal Netherlands Naval Dockyard. CIRP Annals, 45 (1). pp. 427-432. ISSN 0007-8506

[img] PDF
724kB
Abstract:Reengineering production systems in an attempt to meet tight cost, quality and leadtime standards has received considerable attention in the last decade. In this paper, we discuss the reengineering process at the Royal Netherlands Naval Dockyard. The process starts with a characterisation and a careful analysis of the production system and the set of objectives to be pursued. Next, a new production management structure is defined after which supporting planning and control systems are designed and a number of organisational changes are carried through. In this way, the Dockyard may combine high technological capabilities with an excellent logistic performance.
Item Type:Article
Copyright:© 1996 Elsevier
Faculty:
Management and Governance (SMG)
Research Chair:
Research Group:
Link to this item:http://purl.utwente.nl/publications/73195
Official URL:http://dx.doi.org/10.1016/S0007-8506(07)63095-9
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page

Metis ID: 144433