Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems

Share/Save/Bookmark

Smidt-Destombes de, Karin S. and Heijden van der, Matthieu C. and Harten van, Aart (2009) Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems. International Journal of Production Economics, 118 (1). pp. 260-268. ISSN 0925-5273

[img]PDF
Restricted to UT campus only
: Request a copy
249Kb
Abstract:To achieve a high system availability at minimal costs, relevant decisions include the choice of preventive maintenance frequency, spare part inventory levels and spare part repair capacity. We develop heuristics for the joint optimisation of these variables for (a) a single k-out-of-N system under condition-based maintenance and (b) an installed base of multiple identical k-out-of-N systems under block replacement. We show that a straightforward extension of the METRIC method for spare part inventory optimisation yields inferior results, because both the availability and costs are not necessarily monotonous functions of the decision variables. We develop an adjusted marginal analysis and show that it performs considerably better in numerical experiments.
Item Type:Article
Copyright:© 2009 Elsevier
Faculty:
Management and Governance (SMG)
Research Chair:
Research Group:
Link to this item:http://purl.utwente.nl/publications/73115
Official URL:http://dx.doi.org/10.1016/j.ijpe.2008.08.058
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page

Metis ID: 256617