Planning and scheduling in an FMS

Share/Save/Bookmark

Aanen, E. and Gaalman, G.J. and Nawijn, W.M. (1989) Planning and scheduling in an FMS. Engineering Costs and Production Economics, 17 (1-4). pp. 89-97. ISSN 0167-188X

[img]
Preview
PDF
813Kb
Abstract:The Dutch institute of applied physics of TNO and the Institute of Metals TNO (Apeldoorn) have installed a flexible manufacturing system (FMS). The main components of this FMS are a turret lathe, a machining centre and a transport system. One of the objectives of this system is to produce a wide variety of parts in small batches. Several interesting (short term) planning and scheduling problems arise from this objective. Among others, (1) which orders should be processed in a certain period, and (2) in what sequence should the selected orders be processed. In solving these problems, one has to take into account due dates, process plans (routing), capacities of the machines and the tool magazines, tool and jaw changing times, limited fixturing capacity, fixturing and clamping times and the limited number of operators and transport devices. The paper describes the typical characteristics of the FMS with respect to the planning and scheduling problems. A way to solve these problems is presented.
Item Type:Article
Copyright:© 1989 Elsevier
Faculty:
Electrical Engineering, Mathematics and Computer Science (EEMCS)
Link to this item:http://purl.utwente.nl/publications/70478
Official URL:http://dx.doi.org/10.1016/0167-188X(89)90059-1
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page