Estimation in Shewhart control charts

Share/Save/Bookmark

Albers, W. and Kallenberg, W.C.M. (2000) Estimation in Shewhart control charts. [Report]

open access
[img]
Preview
PDF
211kB
Abstract:
The influence of the estimation of parameters in Shewhart control charts is investigated. It is shown by simulation and asymptotics that (very) large sample sizes are needed to accurately determine control charts if estimators are plugged in. Correction terms are developed to get accurate control limits for common sample sizes in the in-control situation. Simulation and theory show that the new corrections work very well. The performance of the corrected control charts in the out-of-control situation is studied as well. It turns out that the correction terms do not disturb the behavior of the control charts in the out-of-control situation. On the contrary, for moderate sample sizes the corrected control charts remain powerful and therefore, the recommendation to take at least 300 observations can be reduced to 40 observations when corrected control charts are applied.
Item Type:Report
Additional information:Imported from MEMORANDA
Faculty:
Electrical Engineering, Mathematics and Computer Science (EEMCS)
Research Group:
Link to this item:http://purl.utwente.nl/publications/65746
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page