A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags
Brucker, P. and Hilbig, T. and Hurink, J.L. (1999) A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags. Discrete Applied Mathematics, 94 (1-3). pp. 77-99. ISSN 0166-218X
| PDF Restricted to UT campus only: Request a copy 1757Kb |
| Abstract: | Positive and negative time-lags are general timing restrictions between the starting times of jobs which have been introduced by Roy in connection with the Metra Potential Method. They allow the consideration of positive and negative time-lags between the starting times of jobs. It is shown that complex scheduling problems like general shop problems, problems with multi-processor tasks, problems with multi-purpose machines, and problems with changeover times can be reduced to single-machine problems with positive and negative time-lags between jobs. Furthermore, a branch and bound algorithm is developed for solving such single-machine scheduling problems. The reductions can be used to construct test problems for this algorithm. Computational results for randomly generated single-machine problems and for shop scheduling problems (without time-lags) are reported. |
| Item Type: | Article |
| Faculty: | Electrical Engineering, Mathematics and Computer Science (EEMCS) |
| Research Group: | |
| Link to this item: | http://purl.utwente.nl/publications/63598 |
| Official URL: | http://dx.doi.org/10.1016/S0166-218X(99)00015-3 |
| Export this item as: | BibTeX EndNote HTML Citation Reference Manager |
Repository Staff Only: item control page

Show download statistics for this publication
Show download statistics for this publication