Integrating Portfolio Management and Simulation Concepts in the ERP Project Estimation Practice
Daneva, M. (2008) Integrating Portfolio Management and Simulation Concepts in the ERP Project Estimation Practice. In: 14th International Working Conference on Requirements Engineering: Foundation for Software Quality, REFSQ 2008, 16-17 June 2008, Montpelier, France.
| PDF Restricted to UT campus only: Request a copy 192Kb |
| Abstract: | This paper presents a two-site case study on requirements-based effort estimation practices in enterprise resource planning projects. Specifically, the case study investigated the question of how to handle qualitative data and highly volatile values of project context characteristics. We counterpart this challenge and expound upon the integration of portfolio management concepts and simulation concepts into a classic effort estimation model (COCOMO II). |
| Item Type: | Conference or Workshop Item |
| Faculty: | Electrical Engineering, Mathematics and Computer Science (EEMCS) |
| Research Group: | |
| Link to this item: | http://purl.utwente.nl/publications/62592 |
| Official URL: | http://dx.doi.org/10.1007/978-3-540-69062-7 |
| Export this item as: | BibTeX EndNote HTML Citation Reference Manager |
Repository Staff Only: item control page
Metis ID: 254971

Show download statistics for this publication
Show download statistics for this publication