Two-stage Maintenance of a Production System with Exponentially Distributed On- and Off-periods

Share/Save/Bookmark

Dijkhuizen, Gerhard van and Harten, Aart van (1998) Two-stage Maintenance of a Production System with Exponentially Distributed On- and Off-periods. International Transactions in Operational Research, 5 (1). pp. 79-85. ISSN 0969-6016

[img] PDF
Restricted to UT campus only
: Request a copy
346kB
Abstract:We consider an on–off production system which is subject to failure during on-periods. In case of a failure, the production system is maintained correctively. In addition, preventive maintenance is carried out to prevent failures. The costs of both preventive and corrective maintenance are modelled in terms of the net down-time of the production system, that is, the time that the system is not available when needed for production. Since preventive maintenance can be planned during off-periods, there is a perspective of significant savings if some freedom is built in concerning the starting time of preventive maintenance. Therefore, a two-stage maintenance policy is considered, which—in a first stage—provides the maintenance manager with a finite interval during which preventive maintenance must be carried out, and—in a second stage—determines the optimal starting time for preventive maintenance within this interval. Computational results offer useful insights, and indicate that significant savings can be achieved in comparison with a classical age maintenance policy.

Item Type:Article
Copyright:© 1998 Wiley
Faculty:
Electrical Engineering, Mathematics and Computer Science (EEMCS)
Research Chair:
Research Group:
Link to this item:http://purl.utwente.nl/publications/58334
Official URL:http://dx.doi.org/10.1111/j.1475-3995.1998.tb00104.x
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page

Metis ID: 124343