Multiple batch structures in throughput scheduling
Weeda, P.J. (1992) Multiple batch structures in throughput scheduling. International Journal of Production Economics, 26 (1-3). pp. 359-366. ISSN 0925-5273
| PDF 631Kb |
| Abstract: | Throughput scheduling deals with maximizing time-constrained throughput in batch production. Previous investigations have shown that time-constrained throughput increases by processing successive batch cycles in simple process configurations consisting of three processes and two facilities, even if set-up times are positive. This paper explores the extension of these results to more complex process configurations. |
| Item Type: | Article |
| Copyright: | © 1992 Elsevier Science |
| Link to this item: | http://purl.utwente.nl/publications/32287 |
| Official URL: | http://dx.doi.org/10.1016/0925-5273(92)90088-O |
| Export this item as: | BibTeX EndNote HTML Citation Reference Manager |
Repository Staff Only: item control page
Metis ID: 144541
Show download statistics for this publication
Show download statistics for this publication