Multiple batch structures in throughput scheduling

Share/Save/Bookmark

Weeda, P.J. (1992) Multiple batch structures in throughput scheduling. International Journal of Production Economics, 26 (1-3). pp. 359-366. ISSN 0925-5273

open access
[img]
Preview
PDF
646kB
Abstract:Throughput scheduling deals with maximizing time-constrained throughput in batch production. Previous investigations have shown that time-constrained throughput increases by processing successive batch cycles in simple process configurations consisting of three processes and two facilities, even if set-up times are positive. This paper explores the extension of these results to more complex process configurations.
Item Type:Article
Copyright:© 1992 Elsevier Science
Link to this item:http://purl.utwente.nl/publications/32287
Official URL:http://dx.doi.org/10.1016/0925-5273(92)90088-O
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page

Metis ID: 144541